Here is another good one. I was told that I only needed a modest garbage area.
Chain link walls with a gate and privacy slats. Coming up to final approval it was determined that I needed a weather resistant, fire resistant garbage area with drainage to the sanitary sewer, in which falling rain on the roof would enter inside the structure and go down a slope to the sanitary sewer.... Ok a week for the architect to get the design, two weeks for permiting to reject the design over a little detail, back to the architect for a two day turn around, two weeks for approval. Add the time to build out the now almost $7k garbage area in the building plan, add the inspection time to have them come and look at the damn thing.