a thoughtful web.
Good ideas and conversation. No ads, no tracking.   Login or Take a Tour!
comment by War
War  ·  3376 days ago  ·  link  ·    ·  parent  ·  post: What is your greatest weakness?

My greatest weakness would have to be my need to make sure my work is done and it's done right. You are probably thinking "That's not a weakness." but when a project with a lot of moving parts presents itself I find myself double or even triple-checking things that don't necessarily need my attention at the moment. It can slow me down, and I have continued to work on it.





OftenBen  ·  3376 days ago  ·  link  ·  

    when a project with a lot of moving parts presents itself I find myself double or even triple-checking things that don't necessarily need my attention at the moment

I feel your pain. I have some competency in my job, now I'm working on building efficiency and speed. But with lots of balls in the air/ moving parts/ pick-a-metaphor It's really easy to get bogged down in finicky little things.

thenewgreen  ·  3376 days ago  ·  link  ·  

I can genuinely see how this would slow you down and be a weakness. That said, much of the advice you see on how to answer this question warns against the "I'm a perfectionist," answers, which this seems dangerously close to. If I'm in the interviewers seat, I may be thinking okay, so you're detail oriented, nothing wrong with that, what's your real weakness? Oraybe it's a perfect answer...? I suppose it's all relative to who is on the receiving end.

Honest answer, how many times did you re-read your comment before posting it? :)

War  ·  3376 days ago  ·  link  ·  

I definitely know what you are saying. I usually only follow my work closely when the project is much larger than something I'm used to on a daily basis. Outside of that though I usually manage my time pretty well.

I only read it over once or twice.